Egress and separations, checked against the clause.

Thirteen of the twenty-seven Ontario rules under fire protection are answered from the drawing: exit widths, stair geometry, rated doors and the separations the code requires. The rest are printed with their clause, because they are decided by the specification.

1.0 What is measured

What the engine reads off the drawing

Every reader runs on every file, whichever trades the audit is scoped to. Choosing this trade decides which rules get reported. The drawing is read either way.

Exits, by the dimension that governs

Clear width and height at every exit door, and the stair geometry behind it: rise, going, width and the rise between landings.

Rated doors, from the schedule

A door the schedule rates is checked for the closer and the hardware its rating requires, against NFPA 80 and the OBC article beside it.

Separations, where they are drawn

An attached garage and its separation are checked as drawn. Where a set states a rating without drawing the assembly, the finding says which is missing.

2.0 The rules

27 Ontario rules, and which of them read the drawing

Answered from the drawing means the check reaches a pass or a fail from what was extracted. Checklist means the rule is printed with its clause for a person to confirm. Both are useful on a permit set, and only the first is a finding.

ClauseWhat it requiresHow it is answered
NFPA 80 §4.1 / OBC 2025 Article 3.1.8 A fire-rated door must carry a labeled, fire-rated closer; an egress door in that partition must also carry panic hardware From the drawing
OBC 2025 Article 9.5.3.1 Exit door clear width must be at least 860mm From the drawing
OBC 2025 Article 9.5.3.1 Exit door height must be at least 1980mm From the drawing
OBC 2025 Article 9.8.4.1(1)(a) Stair riser height must not exceed 200mm From the drawing
OBC 2025 Article 9.8.4.1(1)(a) Stair riser height must not be less than 125mm From the drawing
OBC 2025 Article 9.8.4.1(1)(b) Stair tread going (depth) must not be less than 235mm From the drawing
OBC 2025 Article 9.8.4.1(2) Stair clear width must not be less than 860mm From the drawing
OBC 2025 Article 9.8.4.3 Maximum vertical rise between landings must not exceed 3700mm From the drawing
OBC 2025 Article 9.8.7.1 Handrail required on stairs with 3 or more risers From the drawing
OBC 2025 Article 9.7.4.3 Sleeping rooms must have an egress window with opening area ≥ 0.35 m², min dimension 380mm, sill ≤ 1000mm AFF From the drawing
OBC 2025 Article 9.3.4.2 Attached garage must be separated from dwelling with 12.7mm Type X gypsum board From the drawing
Ontario Fire Code 2025 Article 3.3.2.1 / OBC 9.3.4 Fire separation between attached garage and dwelling: minimum 30 minutes From the drawing
OBC 2025 Article 9.10.19.1 Smoke alarms required on every storey and in each sleeping room From the drawing
Ontario Fire Code 2025 Article 2.8.2 Exit signs required for multi-unit or secondary suite buildings Checklist
Ontario Fire Code 2025 Article 3.3.4 Travel distance to exit must not exceed 25m within a residential suite Checklist
Ontario Fire Code 2025 Article 3.3.5 Secondary means of escape from below-grade sleeping areas Checklist
Ontario Fire Code 2025 Article 2.5.3 / OBC 3.2.5.7 Fire department access route minimum 6.0m wide to building Checklist
Ontario Fire Code 2025 Article 4.4 Propane (LPG) cylinder storage restrictions — no storage inside building Checklist
Ontario Fire Code 2025 Article 6.6.1 No combustible storage in mechanical/furnace rooms Checklist
Ontario Fire Code 2025 Article 6.6.2 Dryer exhaust duct must vent to exterior and be free of lint accumulation Checklist
Ontario Fire Code 2025 Article 6.7 / OBC 9.22 Fireplace and solid fuel burning appliance clearances and installation requirements Checklist
Ontario Fire Code 2025 Article 3.3.2.2 Fire separation between dwelling units (suites): minimum 30 minutes Checklist
OBC 2025 Article 9.10.19.6 Carbon monoxide alarms required adjacent to all sleeping areas where fossil fuel appliances or attached garage present Checklist
Ontario Fire Code 2025 Article 6.8.1 Carbon monoxide detectors required adjacent to all sleeping areas with fossil fuel appliances or attached garage Checklist
Ontario Fire Code 2025 Article 6.8.2 Interconnected smoke alarms required in all residential occupancies Checklist
Ontario Fire Code 2025 Article 6.8.3 Smoke alarm required on every storey and in each sleeping room Checklist
Ontario Fire Code 2025 / OBC 9.10.22 Sprinkler system may be required for secondary suites in multi-storey buildings Checklist

Counts and clauses are exported from the rule packs themselves, by the same function the trade picker inside Blueprint Auditor calls.

3.0 Outside Ontario

What the other packs carry

Ontario is the deepest pack because it is where the rules were written first. Each column shows what that pack holds today, and a zero is a zero rather than a blank.

PackRules in this tradeAnswered from the drawing
Ontario2713
British Columbia44
National Building Code (Canada)55
California54
Florida65
New York City65
IRC (model code)65
England22
4.0 Levelling a quote

The scope a quote gets checked against

Bid Leveler holds a published checklist per trade, so levelling three quotes means asking each of them the same 8 questions. 6 are marked critical: a quote can drop one of those and the bid form will still look complete.

  • 21 13 13 Sprinkler piping and heads
  • 21 12 00 Standpipe and hose cabinets
  • 21 30 00 Fire pump and controller
  • 21 22 00 Special suppression systems
  • 21 11 00 Incoming fire water service
  • 21 05 48 Seismic bracing
  • 21 05 00 Hydraulic calculations and P.Eng
  • 21 13 13 Head relocation to suit ceilings

Scope checklist revision 2026.1, sourced for Toronto and the GTA. It describes what a quote in that market leaves out; elsewhere, treat it as a starting list.

5.0 What it does not do

Said before you pay for it

  • Sprinkler coverage is not designed or checked here. Where the code requires a system, the rule is printed and a person decides.
  • Travel distances are not measured. They need a route, and a route is a judgement about how a building is used.
  • A rated assembly is only as checkable as the drawing is specific. "1 hour" written on a wall is read as stated, not verified against a tested assembly.
  • Nothing here is a permit approval. It is the first pass an experienced reviewer makes, done in minutes and cited to the clause.

Bring the hardest set you have.

A real set off a live job. The audit runs in minutes and every finding carries the clause and the sheet, so you can check the ones you disagree with.